Energy Efficiency

Client:

Shams Power (Pvt.) Ltd.

From September 2023 to December 2023, PITCO has provided third-party technical audit services for solar power plants installed by third-party service providers at multiple commercial and industrial facilities across Pakistan, including 5 MW Dandot Cement, Jhelum; 4.07 MW Tri-Pack, Karachi; 2.01 MW CCI, Multan; 1 MW Shifa Hospital, Islamabad; 1 MW CCI, Hattar; and 530 kW Mondelez, Hub.

PITCO’s services included project inception and client consultations, detailed site assessments, review of PV arrays, mounting structures, inverters, transformers, electrical infrastructure, cabling, grid integration and termination points, as well as thermal imaging to identify hotspots, non-functioning bypass diodes, overheating and other equipment abnormalities. The team also assessed structural integrity, roof load-bearing capacity, PV panel orientation and safety compliance.

The assignment further covered comprehensive system performance evaluation, including energy yield assessment, identification and quantification of system losses, inverter efficiency, component degradation and solar resource assessment. PITCO reviewed historical energy consumption, utility bills and load profiles to assess system sizing and design against actual electricity demand. The team also evaluated O&M practices and records, conducted financial analysis covering CAPEX, OPEX, payback period and ROI, and verified compliance with applicable regulations, permits and utility interconnection requirements. The audits provided the client with an independent technical assessment of plant condition, performance, operational efficiency, financial viability and regulatory compliance.

Share This Story, Choose Your Platform!