Client:
Lucky Cement Limited
From 2008 to 2012, PITCO, in collaboration with First Climate AG Zurich Switzerland, implemented a project for Lucky Cement Limited in Pezu, KPK, Pakistan. The project involved switching from Heavy Fuel Oil to dual fuel (Natural Gas and Heavy Fuel Oil) for cement production, aiming to reduce fuel costs and environmental impact while ensuring efficient energy use.
PITCO’s services included site condition assessments, economic analysis, and preparation of the financial feasibility of the project. Our team assessed the technical viability of heat recovery steam generators (HRSGs) and the financial additionality of the plant as per CDM requirements. PITCO selected the appropriate CDM methodology, conducted environmental, social, and developmental impact assessments, and prepared requests for proposals for CDM Validator/designated operational entity (DOE). PITCO assisted in shortlisting and hiring the DOE, developed the CDM PDD, and provided comprehensive assistance during the validation process. PITCO also reviewed the Initial Environmental Examination (IEE) Report, assisted in acquiring Host Country Approval (HCA), conducted stakeholder consultation meetings, and prepared a CDM monitoring manual.