Shams Power (Pvt) Ltd.
From May 2022 to January 2023, PITCO has been serving as the Owner’s Engineer for the 550 kW Solar PV Power Plant at Mondelez Cadbury in Hub, Balochistan, Pakistan. The project, led by Shams Power (Pvt) Ltd., involves installing and operating the solar PV power plant autonomously under a long-term Power Purchase Agreement (PPA) with the client. The innovative project aims to provide clean power at 5% below the baseline cost of electricity for Mondelez Cadbury, marking a significant step towards sustainable energy practices in Pakistan.
PITCO’s services include conducting a site survey and assessment, feasibility study, interconnection point assessment, and capacity analysis. Our team also reviews the regulatory environment, performs in-depth shadow analysis and yield estimation, and optimizes the system layout. PITCO select key equipment, conduct structural analysis, and prepare specifications for solar PV modules and inverters. PITCO assists in bid evaluation, oversees power plant erection, performs pre-commissioning tests, designs the earthing/grounding scheme, and commissions the PV plant. Additionally, PITCO prepare an Operation and Maintenance (O&M) Plan and study net metering requirements and applicable regulations of AEDB, NEPRA, and DISCOs.